Installation and assembly of lifting equipment

Installing lifting equipment requires planning, site verification, definition of responsibilities, logistics, assembly, electrical integration and testing.

Kranz Equipamentos carries out installation work according to the approved scope and the conditions assessed beforehand.

Planning

Items defined before mobilisation

  • Access to the site
  • Isolation of the area
  • Auxiliary lifting equipment
  • Available structure
  • Power supply points
  • Obstructions
  • Authorised hours
  • Civil liability
  • Documentation
  • Client's resources
  • Safety conditions

Scope

Activities performed

  1. Receipt
  2. Structural assembly
  3. Mechanical assembly
  4. Electrical installation
  5. Alignment
  6. Integration of controls
  7. Tests
  8. Guidance
  9. Delivery of documentation

Installation and assembly

Plan the installation in advance

Defining access routes, auxiliary means, power and authorised hours in advance reduces interference with the operation during assembly.